====== Reinforced Concrete ====== CE 3213 [[http://webct.utsa.edu]]†. * 7/5/07, 7:00-8:30 pm: Make-up Exam * 7/9/07, 10:30 am - 1:00 pm: Final Exam ====== Homework ====== Homework is due at 5:00 p.m. * [[concrete:hw2_1]]✔ * [[concrete:hw2_2]]✔ * [[concrete:hw2_3]]✔ * [[concrete:hw2_4]]✔ * [[concrete:hw2_5]]✔ * [[concrete:hw2_6]]✔ * [[concrete:hw2_7]]✔ * [[concrete:hw2_8]]✔ * [[concrete:hw2_9]]✔ * [[concrete:hw2_10]]✔ * [[concrete:hw2_11]]✔ * [[concrete:hw2_12]]✔ * [[concrete:hw2_13]]✔ * [[concrete:hw2_14]]✔ * [[concrete:hw2_15]]✔ * [[concrete:hw2_16]]✔ ====== Project 1: Field Visit to a Concrete Construction Site ====== //The project should be developed in groups not exceeding four students. A group shall consist of three to five students. Each group must visit a different site. On July 3, each group will give a short [[concrete:presentation|presentation]] (minimum 10 minutes, maximum 15 minutes) on their field visit.// * [[concrete:members]] * [[concrete:report]] * [[concrete:presentation]] Photos from 6/11/07 ===== Due Dates ===== //[[concrete:members|Group members†]] and site selection: No later than June 14, 2007, submit at the beginning of the class the names of group members (minimum 3 and maximum 5) and a location map of the site selected.// //[[concrete:report|Final report]] and [[concrete:presentation|presentation]]: July 3, 2007. Final reports will not be returned. Make copies of the sections of the report you wish to keep. Reports must include an electronic copy of presentation.// ===== Grading ===== //You will be graded on the quality of the report, the quality of the presentation, and your writing and oral skills.// {{gallery>concrete:photos?4}} ====== Project 2 ====== [[concrete:project_2-assignment]] * June 11: [[concrete:project_2-config|Structural configuration]] (including preliminary sizes), construction sequence, material types and loading. {{concrete:project_1-config.svg}} * June 18: [[concrete:project_2-vm|Shear and bending moment diagram envelopes]] for slab, and frames. * June 25: Design of [[concrete:project_2-slab-beam|slab and beams]] * June 28: Design [[concrete:project_2-col|Columns]]. * July 2: [[concrete:project_2-footings|Design of footings]] and [[concrete:project_2-drawings|final drawings]]. * July 5: Summarize quantities, calculate cost and submit [[concrete:project_2-report|final report]] (reports will not be returned). (No later than 5 p.m.)