Chapter 2
— David Wagner 2007/06/29 15:40
Problem 1.
1842 sf
7 ft
478
| 478 BCY |
|---|
Problem 2.
- Swell: 25% [Tbl 2-5]
- Angle of Repose: 32º [tbl 2-6]
- Excavation:
25 cf/ft
12.65 ft
3.95 ft
| b=12.65 ft, h=3.95 ft |
|---|
Problem 3.
Is >50% larger than ¼” → Gravel
| GM |
|---|
Problem 4.
L=1 yd; V=1.3*1*24/27= 0.89 BCY/yd; R=35°
5.08 yd
1.78 yd
| B=15', H=5.3' |
|---|
Problem 5.
1460000 LCY;
Trucks:
243000
| 243,000 trips |
|---|
Problem 6.
31.2
| 31.2 min/hr |
|---|
Problem 7.
a.
- Cut: 150+100=250,000 BCY
- Fill: 80+120+100=300,000 BCY
- Waste: 0
- Borrow: 50,000 BCY
b.
- Haul Length 3: 6700-5100=1600'
Problem 8.
0.81
0.85
| LF:0.81 | SF:0.85 |
|---|
Problem 9.
5.6%
| Moisture Content:5.6% |
|---|