Problem 1.

  • Average 7-day maximum pavement design temperature: 58°C
  • Minimum pavement design temperature: -10°C

Problem 2.

Mix Design Field Mix
(cf) (lb)
Cement 0.478 7.1*94= 667
Sand 1.421 7.1*(235+14)= 1768
Gravel 2.500 7.1*(415+8)= 307
Water 0.865 7.1*32= 227
Total 5.264

Excess Water: 235*0.06+415*0.02=14+8=22 lb

Capacity: 34*1.1=37.4 lb; N=7.1 batches

Problem 3.

Compnonent Fraction Total Rate (dry) Rate (field)
Asphalt 0.06 140 8.4
Aggregate 0.94 140 131.6 140
1.00 140 140.0
Aggregate components (dry weight)
Coarse A 0.50 131.6 65.8 70.0
Coarse B 0.20 131.6 26.3 28.0
Sand 0.24 131.6 31.6 33.6
Mineral Filler 0.06 131.6 7.9
131.6

(Feed rates in tons per hour.)

Problem 4.

Compnonent Fraction Total Rate (dry)
Asphalt 0.05 3 0.15
Aggregate 0.95 3 2.85
1.00 3 3.0
Aggregate components (dry weight)
Coarse A 0.45 2.85 1.28
Coarse B 0.35 2.85 1.00
Sand 0.15 2.85 0.43
Mineral Filler 0.05 2.85 0.14
2.85

(Rate is tons per batch)

Problem 5.

This is a computer programming problem.

Problem 6.

a. w/c=50/94=0.53

w/c=0.53

b. Lowering the water content makes the mix less workable, so it may not fill forms properly and make voids or honeycombing. Adding plasticizers may help lower water content while maintaining workability.

Problem 7.

To get 100% passing 2½”, use a roller crusher closed side setting of 1¼ or smaller.

Jaw Setting: 4 Roll Setting: 1.25 Total: 150 tph
ScreenPassingSent to RollerPassingOutput (%)Output (tph)
2.5 48% 52% 100% 100.00% 150.0
2 39% 95% 88.40% 132.6
1.5 29% 82% 71.64% 107.5
1.25 25% 80% 66.60% 99.9
1 19% 66% 53.32% 80.0
0.75 15% 49% 40.48% 60.7
0.5 11% 32% 27.64% 41.5
0.375 8% 25% 21.00% 31.5
0.25 6% 18% 15.36% 23.0
Jaw: 4”Roller: 1¼”

Problem 8.

  • Total Screen Load: 37.3 tph
  • Passing Screen: 16.1 tph
  • Total Feed: 3.9 tph/sf; Passing: 1.95 tph/sf [fig. 7-6]
  • DPF: 0.8; HSF: 0.7; OF: 57%; TH: 1.27; Pass: 0.86

Total Feed Capacity: 3.9*0.8*0.7*1.27*1=2.8 tph/sf

Size Feed: 37.3/2.8=13 sf

Passing Capacity: 1.95*0.8*0.7*0.86*1=0.94 tph/sf

Passing Size: 16.1/0.94=17

17 sf

Problem 9.

16/4.950=3.23≈3 mixes/batch

Mix Design Field Mix
(lb) (SG) (cf) (lb)
V={WT/{62.4SG}} 3*WT
Cement 94 3.15 0.478 282
Gravel 395 2.66 2.380 1185
Sand 215 2.65 1.300 645
Water 50 1.00 0.801 150
Total 4.95